Metro: world-beatel or shambles!
Socialist Organiser1980 1980-09-27Read it in the scan (PDF), scan page 11 →
Read from the scan by machine and not corrected: expect misread words, and now and then a caption or a line from a neighbouring story. For anything you quote, read the scan.
Scan page 11
to BL?
No more stories about incompetent managers, strike-happy shop stewards, and sleeping workers. Now it's all sweetness and light under the wonderful leadership of that dynamic little Mr Edwardes.
Even the news that BL lost £181 million in the first six months of this year (compared with £20 million profit in the same period last year), was passed over with little more than a shrug of the shoulders and a few philosophical comments about 'extraordinary expenses' (i.e. closing down factories), the collapse of the car market, and the uncompetitive f.
In most papers these rather boring financial trivia were completely eclipsed by the carefully-leaked news that the new Mini Metro will do no less than 80 mpg 'Michael's Metro Miser' said the Daily Star. Even if you don't drive at a continious 30 mph on empty roads without ever changing gear, you'll still get about 40 mpg out of it.
Dealers were said to have had tears in their eyes when the Metro was unveiled to them on a boat trip round the Isle of Man. We weren't told whether the emotional outbursts were brought on by the Metro itself or by other causes, but dealers were represented as saying things like "Sir Michael's got it right this time" (or at least, "Shir Miles gorrit rithish What you haven't been told is that to date there are less than 100 Metros completed for sale — and the car is due to be launched in mid-October. Workers at Longbridge have been surprised to read stories about one Metro every 40 seconds coming off the production line. As one Longbridge Metro worker commented:
"Why stop at one car every 40 seconds? We could have a car every 20 seconds and people throwing components and bits of trim at the empty body shells as they whizz past"
The truth is that the company are in big trouble with the Metro. There are 4,000 body shells in various stages of completion, waiting for rectification, strewn all around the Longbridge plant. Because of the partial closure of the Kings Norton Seat Building factory, there are not enough seats to go round. Every single drive shaft is having to be changed and major rewelding is being done on completed and painted body shells. But the main problem is that on the Metro line itself the job timings imposed without negotiation from theoretical times drawn up by industrial engineers, are completely •THE Seottish TUC won't even take up the fight to defend basic Hahnie Munroe, yard convenor union rights" • said at Hunterston, speaking at the Glasgow cuts campaign conference on 13th September. «We've lost our jobs to protect the Health and Safety Act. We've come into contact with the terror tactics of the state -there's been hundreds of police down at our picket, with 48 of us arrested.
'We're in confrontation with the bosses, our union leaders, and the STUC. The STUC has run away from the fight. We're asking people here to come out in support and we're calling on unrealistic. Workers are faliing over each other as they attempt to complete their job within the time and track space allocated to them. As a result most Metros require considerable rectification and "retrospective fitting" of missing components at the end of the line. Instead of negotiating more workable timings, the company have been insisting their times should be rigidly adhered to as a matter of principle. Thus one whole Allegro track has had to be closed down (despite relatively high demand for that model) and transferred onto Metro rectification and retrospective fitting. Enormous hours of overtime are being worked (with the cooperation of the Works Committee) as the company flounder around trying to cobble together enough cars for the launch. If everything went according to plan, there would be 6,500 an even stronger reason to figure isn't going to he met.
The bosses can't blame the unions or the workforce this time. The Works Committee at Longbridge have been bending over backwards to cooperate with the Metro at every stage. Twice the national agreed level of overtime is being allowed and for the first time dispensation has been granted for overtime on the weekend before the September holiday (against the recommendation of the Confed). When workers on System 3 finishing track threatened a work to rule over the intolerable conditions and timings being expected of them, the Works Committee instructed them to be 'flexible'. And when the women in the sewing room voted to reject the company's demand for "two weeks about" night work, the Works Committee pleaded with them to cooperate. The attitude of the union leadership at Longbridge is summed up by the following bulletin issued by the Works Committee on 28th August:
ment in trading." and great opportunities for our members at Longbridge. The importance of this car being built to exceptional standards cannot be overemphasised and that is the purpose of this bulletin... We encourage all the workforce at Longbridge to recognise the challenge, grasp the opportunities and prove to the world at large the skills and expertise of our membership.
So even with very low production targets and total union cooperation, the bosses have still made a dog's dinner of the Metro launch. Small wonder that many Longbridge workers are asking themselves just who these well-heeled pin-striped "managers" are, and what purpose do they serve? Assuming that the world really does need yet another 3-door hatchback car, there can be no doubt that workers at Longbridge could have "managed' the launch of the Metro considerably more competently that Michael Edwardes and his henchmen.
----- pull-quotes -----
SCOTTISH UC Themeed more than mutuals