fight for worksharir
Socialist Organiser1981 1981-03-21Read it in the scan (PDF), scan page 10 →
Read from the scan by machine and not corrected: expect misread words, and now and then a caption or a line from a neighbouring story. For anything you quote, read the scan.
Scan page 10
21 EETPU, AUEW and Sheetmetal workers in the engineering department at Morganite Ceramic Fibres of Bromborough are in dispute with the management over redundancies.
3 of the 21 workers in the department were made redundant. Immediately the := DE 45=T0m = to: E: Eas a rEa === De DEI agreed 10 =i-sharing with a cut in =a! The company refused, saring it is bot company polica. men refused to be intimidated by the threat. Since the letters were sent they have been told that they are still employed.
Their fight is being hampered by scab wagons (from Southwoods and Gopsill) crossing the picket line. Another problem is that two of the three blocks in the plant are still working (mostly TGWU members who are frightened of losing their jobs).
The men say that if scabbing contiues that they will have to picket the MCF plant at Newston.
The men are in good its. but need money to cue she fight.
Misses: support and tiss Te per i Pubiisted by Socialis: Orgas. iser. co 214 Sackert Coar. London N1 2SY, and printed by Morning Litho (TU). Signed ai. ticles do not necessarily represent the views of SO.
Scan page 11
suolun SHN